Problem Summary
Production orders cancellation issue; Production orders cancellation issue, goods postings 102E did not happen
Admin Info
Purpose
|
Production orders cancellation issue
|
Requested by
|
Guy Gervil
|
Issue Date
|
04-09-2013
|
Resolved by
|
Adithya
|
Resolved Date
|
04-09-2013
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
Reported that though confirmations of Production Orders are cancelled for Olympia Orders, stock is still existing and is showing in MD04.
Solution Analysis and Recommendations
(Include Screen Shots if required)
Confirmations are cancelled for all the Production Orders related to Olympia Order, but it is observed that GR Reversal (102 E movement) is not carried out and we still see the delivered quantity in the production order. Hence the stock existing and is still showing in MD04. "GR reversal (102 E) is not carried at that point because "the Plant data of the material is locked by the user BEAARR"
If we display the Cancelled Confirmations, if we see the goods movement are in blue color, which means they are yet to be processed.
We can correct these goods movements in COGI or CO1P.
Could not able to identify these goods movement errors in COGI.
Resolution
Clear the goods movement error: Reversal of GR in CO1P Transaction.
Go to CO1P and give the Production Order number and flag the Check Box "Goods Receipt" to clear 102 E goods movement. Select the error and save. which clears the goods movement, and delivery quantity becomes zero in production order which will put back the stock and in MD04 Screen production order is seen a place of stock.
If all these orders need to be TECOd, if it did not consume Blanks (Component) Goods Issue Reversal (262 E movement) is to be carried out, it can be done by CO1P giving the Production Order number and flag the Check Box "Back Flushing" to clear 262 E goods movement. By doing this Goods Issue is also reversed, which makes the cost of the order ZERO.
If Goods Issue Reversal is not carried out we get an error while doing TECO for the Order "Order has still Processing records" we can still TECO the order, but Blank Material consumption cost would hold to that order.
Release Information
Provide link here to Release Notes if Technical Objects were changed